Procurement & Scoping

Buying Private AI Infrastructure

An internal scoping guide for organisations bringing a private deployment through procurement. It covers who owns which decision, the security and hosting questions worth settling early, and the requirements to establish before committing to a production deployment.

1. What Scoping Produces

A scoping exercise should end with two documents, not a meeting note: a written requirement that a supplier can quote against, and a decision record showing who accepted which risk. If either is missing, the project is agreed in principle only, which is where budgets tend to drift.

The requirement does not need to be long. It needs to name the documents in scope, the people who will use the system, what a pass looks like, where the data will sit, who is responsible for each operational duty, and how the arrangement ends. Everything else is detail that can be settled during the assessment.

2. Who Owns What

Private AI projects stall when a decision has no owner. In practice five responsibilities need names, and they are rarely the same person.

Responsibilities and the decision each one owns
Responsibility Decision they own
Business sponsor Whether the value case is worth funding, and who is accountable for the outcome after go-live.
Document owner Whether the corpus may be indexed at all: which folders, which classes of record, and what must stay excluded.
IT / infrastructure lead Rack, power, cooling, network segment, server administration, patching duties and backup arrangements.
Security & compliance Data categories permitted, review requirements, logging expectations, and whether the residual risk is acceptable.
Finance / procurement Contract form, staged commitments, capital versus recurring treatment, exit terms and asset disposal.

Two of these are commonly skipped and both cause trouble. Without a document owner, indexing authority is assumed rather than granted. Without a named IT owner, nobody patches the machine in eighteen months.

3. Security Questions to Settle

These are the questions your own security review should answer before a deployment is approved, whatever supplier you use.

  • Where does the machine physically sit, who can walk up to it, and what does the facility's access control look like?
  • Who holds administrative access to the server, over which network path, and is everyday use separated from administration?
  • What crosses the network boundary — for on-site systems, whether the server needs outbound access at all, and for hosted systems, how the link to your staff is protected.
  • How are updates applied, by whom, on what cadence, and what is the rollback position if an update misbehaves?
  • What is logged — queries, administrative actions, index jobs — where logs are stored, and for how long.
  • How is data restored, from what, and has a restore actually been performed rather than described?
  • What happens at disposal — drives, the machine itself, and any copies taken for backup.
  • Where do the model files come from, under what licence, and can the licence be relied on for commercial use?
  • Who is called during an incident, and what evidence would your review need afterwards?

Related detail is on Security & Data Sovereignty Architecture and Access Governance. If your process requires a certification we do not hold, that is a genuine blocker and should be established early rather than at contract stage.

4. Hosting Decisions

Two delivery shapes exist: a server on your premises that you own, or a dedicated single-tenant server arranged for you. The decision is usually made on facilities and appetite rather than on ideology.

Questions for an on-site server

  • Is there rack space, a spare power circuit and enough cooling headroom, confirmed by whoever runs the comms room?
  • Can the machine sit on its own network segment, reachable only over HTTPS from staff networks?
  • Who replaces a failed drive or accelerator, and how quickly does that matter to the business?
  • Is there a physical security and access record for the room, or would the server be the most controlled asset in it?

Questions for dedicated hosting

  • Where is the facility, and does its location satisfy your data-residency expectations?
  • Does the arrangement guarantee a server used only by your organisation, with no shared tenancy?
  • Who at the provider can reach the machine, under what controls, and is that acceptable to your security review?
  • What happens to the data and the hardware when the arrangement ends?
  • Which terms — facility, provider, support, termination — are yours to review before deployment rather than after?

Facility location, hosting provider and the specific terms are agreed with you in writing before any deployment. Nothing in this section is a claim about a facility we operate.

5. Settle in Writing

A written requirement is what makes a quote comparable and a dispute avoidable. At minimum, record:

  1. Document scope — sources, folders, formats and any excluded material.
  2. User scope — which groups get access, and whether access mirrors existing file permissions.
  3. Acceptance criteria — the questions the pilot must answer correctly, the citations they must produce, and the pass marks agreed in advance.
  4. Responsibility split — who patches, who monitors, who restores, who trains, who answers staff questions.
  5. Data handling — retention, deletion, return of copies at exit, and what happens to the index.
  6. Hardware ownership — who owns the server, who insures it, and what happens to it at end of term.
  7. Support arrangements — the support route, escalation contacts and hours, as agreed for your engagement rather than assumed from a generic promise.
  8. Change control — how scope changes are priced and approved.
  9. Exclusions — records remediation, facilities work, third-party licences and anything else outside the quote.
  10. Exit and handover — what documentation, credentials and data you receive if the arrangement ends.

If a supplier will not put it in writing

That is a reasonable reason to walk away. An arrangement that depends on someone remembering what was agreed is not a commercial term. This applies to us as much as to anyone else.

6. The Buying Sequence

The sequence is deliberately staged so that each commitment is smaller than the next decision it informs.

  1. Written requirement — produced internally, using the list above and the project brief template.
  2. Assessment — a paid, fixed-fee visit quoted before booking. Its report either supports a deployment or recommends against one, in writing.
  3. Pilot — a bounded trial measured against the acceptance criteria from step two, with a go/no-go gate at the end.
  4. Deployment — quoted once the pilot has established what production actually needs.
  5. Care — the recurring arrangement, with its inclusions and notice terms in the agreement.

Each stage stands alone. You can stop after any of them, keep the documentation, and proceed no further. That is a feature of the model, not a loophole — an assessment report has value even if the project does not proceed.

7. Procurement Evidence & Limits

Procurement teams are entitled to know what is not available, so that gaps are visible before they become issues:

  • No published certification set. We do not claim ISO certification, SOC attestation, Cyber Essentials status or a government supplier listing. If your process requires one, say so and we will confirm the position honestly.
  • No standard DPA template on this site. Data processing terms are negotiated per engagement and recorded in the agreement, alongside the hosting and support terms.
  • No published SLA schedule. Support hours, escalation paths and response expectations are agreed for your engagement; they are not advertised as a uniform promise to all customers.
  • No named subprocessor register on this site. Where hosting or other services involve third parties, they are identified in the engagement agreement for review.
  • Procurement evidence. Tell us which insurance certificates, financial information or audit reports your process requires. We will confirm what is available before you commit to an assessment.
  • No reference customers. We do not publish client names, logos or case studies on this site.

Stating these plainly is more useful than a badge wall. The Terms of Business page sets out the operational principles that are agreed, including ownership, boundaries and the human review requirement.

8. Starting a Conversation

Tell us what you are trying to solve, even roughly, and we will say what an assessment would need to inspect and what it would cost, in writing.