Physical Specifications

Comms Room & Infrastructure Requirements

The facilities information we check before specifying an on-site server: rack dimensions, weight limits, electrical capacity, cooling and network access. Final requirements come from the selected equipment and site assessment.

1. Rack Space & Enclosure Depth

The server will use an enterprise chassis built for standard EIA-310 19-inch server cabinets. Depending on the document corpus and accelerator configuration selected during your assessment, it will require either 2U or 4U of contiguous vertical rack unit space.

Chassis Configuration Vertical Rack Space Minimum Enclosure Depth Fully Laden Weight
Compact 2U Rack Chassis
Dual GPU accelerators (up to 96GB VRAM)
2U (88.9 mm / 3.5 in) 800 mm (rail-to-rail clearance) 24 kg to 29 kg
High-Density 4U Rack Chassis
Quad GPU accelerators (up to 192GB VRAM)
4U (177.8 mm / 7.0 in) 900 mm to 1000 mm recommended 38 kg to 46 kg

Chassis are normally quoted with sliding rails compatible with square-hole or threaded round-hole racks, plus cable management arms. Confirm the rail kit, adjustment range and rear clearance for the selected model.

2. Electrical Specifications & Dual Power Feeds

Enterprise AI accelerators draw in sharp bursts as batch token generation spins up. To avoid nuisance trips and unexpected reboots, the comms room should supply clean, grounded single-phase AC on circuits sized for the load.

  • Input Voltage: 200V–240V AC, 50Hz (Standard Irish & UK commercial supply).
  • Connection Types: Standard IEC C13 / C14 or C19 / C20 plugs supplied to match your Power Distribution Unit (PDU) receptacles.
  • Circuit Allocation: A dedicated circuit is recommended so the server's load does not share with office equipment. Its capacity should be sized for the selected server rather than assumed from the chassis size.
  • Redundancy: The specified chassis carry dual hot-swap power supplies in 1+1 failover, rated 1200W–2000W depending on model. Where available, connect the two supplies to separate A/B UPS paths.

Typical Continuous vs Peak Electrical Consumption

While idling, a 2U server draws approximately 180W. During concurrent multi-user prompt synthesis and document re-ranking, continuous draw hovers between 750W and 1,050W. A 4U quad-GPU server under peak continuous OCR extraction draws between 1,200W and 1,400W. These are indicative figures for the chassis categories; check them against the configuration quoted.

3. Thermal Load & Airflow Metrics

Accelerators reject heat into the comms room. Unlike consumer graphics cards that recirculate air inside a case, enterprise accelerators rely on front-to-back chassis blowers running at high static pressure, which is why cabinet airflow matters.

Chassis Profile Heat Dissipation (Typical) Heat Dissipation (Peak Load) Target Comms Ambient Temp
2U Dual-Accelerator Server 2,500 BTU/hr (approx. 730W) 3,600 BTU/hr (approx. 1,050W) 10°C to 28°C (non-condensing)
4U Quad-Accelerator Server 4,100 BTU/hr (approx. 1,200W) 5,500 BTU/hr (approx. 1,600W) 10°C to 26°C (non-condensing)

Cabinet airflow matters: check front and rear door perforation and any restrictions against the selected server's installation requirements. Solid glass doors without forced ventilation are unsuitable for enterprise GPU workloads.

4. Network Connectivity & Air-Gapped VLAN Topology

The design assumption is that sensitive data stays in your building. The server does not need public internet port forwards or inbound connections, and the default configuration refuses them.

  • Physical Interfaces: Dual 1GbE/10GbE RJ45 Base-T ports, or optional SFP+ 10GbE optical transceivers for direct connection to core switches.
  • Private Isolated VLAN: The server should be assigned an isolated internal IP address within a dedicated VLAN. Firewall rules should restrict ingress traffic solely to authorized internal subnet ports (HTTPS port 443 for web client access, and optional LDAP/SMB ports for Active Directory synchronization).
  • No Inbound Public Routing: The deployment is specified without a public IP address, NAT port forward or dynamic DNS entry. Remote maintenance, where agreed, runs over a route you approve or is carried out on site.

5. The On-Site Assessment Verification

Before any hardware order is placed, the assessment includes an on-site physical inspection of your comms room. Rail depths, PDU outlets, ambient airflow temperature and switch port configuration are checked so that installation is planned rather than improvised.

Learn more about our fixed-fee Technical Assessment →